Case Study

Opportunity

The client needed to finalise the design of a large processing factory in south east Asia. There was no internal resource available to complete the process design. The factory needed to produce product for many countries, each with its own stringent regulatory requirements.

Response

Bullant worked with client personnel to:

  • Create a process map of the facility identifying expected running rates
  • Prepared a preliminary, levelled production schedule showing which products were the priority
  • Investigated the regulatory requirements of each destination country
  • Modified the design and capability in response to the regulatory requirements

From this work Bullant were able to prepare a process design which connected the business requirements with the technical capability of the proposed plant.

Bullant then provided a professional support resource to prepare the process specification for the internal project managers.

Outcome

A very complex project was kept on track with the injection of Bullant capability and resource. Process engineering responsibilities were handed over to a client resource once he became available.